One of the most common questions we hear: 'How long will this take?' And one of the most common disappointments in web design is projects that drag on for months past their expected completion date.
Here's an honest breakdown of what goes into a website timeline and where projects most commonly get delayed.
The Short Answer
For a typical small business website — 5 to 10 pages, professionally designed and written — expect 1 to 3 weeks from kickoff to launch if both sides are responsive.
If the project involves e-commerce, custom functionality, a large number of pages, or multiple rounds of feedback, add more time. But for a straightforward lead-generation website for a local service business, 2 weeks is a realistic target.
Phase 1: Discovery and Planning (Days 1–3)
Before any design work starts, there's a discovery phase: understanding your business, your competitors, your target customer, and what success looks like. This usually involves a call or questionnaire and takes a few days to complete.
This phase also includes gathering assets: your logo files, any photos you have, color preferences, and examples of websites you like. If you don't have these ready, the project can stall here before it even starts.
Phase 2: Design and Development (Days 4–12)
Once the discovery is done, the designer builds the site. For a straightforward project, this takes about a week. The designer will typically show you a draft of the homepage first, get your feedback, then complete the remaining pages.
This is the phase most people think of as 'building the website,' and it's usually not where projects get delayed — the delay usually comes from the back-and-forth of feedback.
Ready to Get Started?
We typically launch small business websites within 7–14 days. Request a free review to get started.
Phase 3: Revisions and Feedback (Days 10–18)
Most professional web designers include 1–3 rounds of revisions in their quote. This is where client-side delays most often happen.
The most common causes of delay in this phase: - Client is too busy to review the draft promptly - Multiple stakeholders need to approve, and they have conflicting opinions - Client changes their mind on fundamental things like color scheme or page structure after seeing the draft - New content needs to be written or sourced
Setting clear deadlines for feedback — 'please respond within 48 hours' — dramatically speeds this phase up.
Phase 4: Launch Preparation (Days 18–21)
Before the site goes live, there's typically a checklist to complete: connecting the domain, setting up SSL (the security certificate), testing on multiple devices and browsers, submitting to Google, and final proofing.
This phase usually takes 2–3 days if there are no technical complications with the domain or hosting provider.
What Causes Projects to Take Months Instead of Weeks
Almost every web project that drags on for months comes down to one of these:
- The client is slow to provide content — photos, copy, or basic information about the business
- The client has frequent change-of-direction requests that require rework
- The designer takes on more work than they can handle
- There's no clear agreement on scope, so the project keeps expanding
The solution to most of these is a well-written contract with a clear scope and defined timelines for both parties.
How to Get Your Website Done Faster
The single biggest thing you can do to speed up your web project is show up prepared. Before your first meeting with a designer:
- Have your logo ready in a vector or high-resolution format - Have at least 10–15 real photos of your work, team, or location - Know what pages you need and have a rough idea of what goes on each one - Have examples of 2–3 competitor or reference sites you like and why - Have your phone number, address, business hours, and service area ready
Clients who come prepared typically launch 2–3 weeks faster than those who don't.
Frequently Asked Questions
Can a website be built in a week?
Yes, for a simple 3–5 page site with minimal customization and a client who is very responsive with feedback. We've launched sites in 5 business days when everything was in place from day one.
What if I don't have professional photos?
High-quality stock photos can fill the gap temporarily, but real photos of your business always perform better. Consider hiring a local photographer for a half-day shoot — it's usually $200–$500 and makes a significant difference.
What if I need something changed after the site launches?
Ask about this before you hire. A professional designer should either include a support period or offer a reasonable hourly rate for post-launch changes. Avoid designers who require a monthly retainer just to update a phone number.